Most industrial AI projects never leave the pilot stage. This four-step method maps each data and AI use case to a Cost Deployment loss and positions it on an impact/feasibility matrix.
By Mathieu Cura
Key takeaways
The graveyard of industrial AI is full of impressive proofs of concept that never made a cent. Measuring value is the first stumbling block: in the Verdantix 2025 survey of 333 industrial firms, 85% say that the immaturity of AI solutions or the difficulty of measuring their ROI is a significant barrier to the success of their AI analytics projects.
To escape this "PoC purgatory", World Class Manufacturing Data Architecture (WCM-DA) applies the logic of the WCM Cost Deployment pillar to data. Instead of chasing technology for its own sake, every data initiative is mapped to a financial and operational loss.
Prioritization is not a task for the data team alone. It brings together plant management, the WCM coordinator and frontline operators, along with process engineering, data, IT and OT experts. This mix is what makes the exercise work: it builds a shared understanding of why and how each initiative should be executed, based on clear objectives and measurable benefits and effort.

Never ask "What can we do with artificial intelligence?" Ask instead: "According to our Cost Deployment matrix, what are our top three financial losses this quarter?" Typical answers include unplanned downtime, scrap rates or energy spikes.
If a data model or architecture solves this problem, what is the bottom-line value? Four criteria measure it:
This is where most data projects fail. Feasibility is graded on tangible criteria:
A simple grid keeps the scoring consistent across teams and sites:
| Axis | Criterion | Score 1 | Score 5 |
|---|---|---|---|
| Impact | Financial ROI | Marginal savings | Among the plant's top losses |
| Impact | OEE gain | No measurable effect | Several OEE points on a bottleneck |
| Impact | EHS and sustainability | None | Major safety or carbon reduction |
| Impact | Organizational efficiency | No time freed | Significant expert time freed |
| Feasibility | Data | Sensors missing | Data historized, clean, contextualized |
| Feasibility | Infrastructure | Hardware or software to buy | Ready to use |
| Feasibility | Culture and expertise | Skills missing, team reluctant | Skills in-house, team asking for it |
Score each criterion from 1 to 5 and average each axis. An average above 3 places the use case in the upper half for impact, or the right half for feasibility.
The two scores position each use case in one of four quadrants, each with its own decision.

High impact, high feasibility. These projects target a major bottleneck, and the plant already has the data and infrastructure to address it.
Example: predicting fouling on a critical heat exchanger.
High impact, low to medium feasibility. These projects promise large paybacks, but the plant lacks the digital maturity or the hardware to deliver them today. They require upfront investment (CAPEX).
Example: real-time batch quality optimization with a soft sensor.
Low impact, high feasibility. These projects are easy for data experts to build but add almost nothing to the bottom line. They are the classic trap of IT teams working in isolation.
Example: predictive maintenance on an auxiliary utility pump.
Low impact, low feasibility. These projects are often born from industry buzzwords or trade show enthusiasm. They are complex, expensive and do not address a specific loss.
Example: a 3D digital twin of the entire plant.
The matrix is not a one-off exercise. Quick Wins fund and build credibility for Strategic Projects, while the investments made for those projects improve feasibility for the next ones. As the WCM-DA pillars mature (skills, standards, platform), use cases move to the right of the matrix. Reviewing the matrix every quarter, alongside the Cost Deployment update, keeps the portfolio aligned with the plant's actual losses.
Once a use case is live, the financial loop closes: the platform tracks the targeted loss to confirm the expected savings, as described in Pillar 5 of the WCM-DA framework.
See how OIAnalytics collects, contextualizes and analyzes your plant data to tackle your biggest losses.
How do you prioritize AI use cases in manufacturing? Start from the largest losses in the Cost Deployment matrix, then score each candidate use case on operational impact and feasibility. The position in the impact/feasibility matrix determines whether to execute, fund, postpone or reject it.
What is PoC purgatory? It is the situation where industrial AI projects succeed as proofs of concept but never reach production or deliver measurable value, usually because they were not tied to a specific loss or lacked the data, infrastructure or team buy-in to scale.
What criteria measure the feasibility of an industrial AI project? Data availability and quality (sensors, Historian, contextualization), infrastructure (edge, cloud and software), and the team's culture and expertise.
Who should be involved in prioritizing data use cases? Plant management, the WCM coordinator, frontline operators, and process engineering, data, IT and OT experts.